History

Tides Reach means the residential development of the properties within the Community. There are 30 sections (including the land where the communal facilities are located) that have been developed in 3 stages by Brian and Elizabeth Darragh Limited since 1997. The first house was built in 2000. The development has been designed so that residents contribute to, and enjoy a high quality, safe environment.