Project Log
This is a record of the Tides Reach Committee efforts to foster an ideal neighborhood.
2019
- 16/09 Storm water basins rebuilt. Tides Reach Expenditure
- 01/09 Mailbox pedestal restored and painted. AED sign installed. Tony
- 17/08 Main Gate area cleaned and spruced up. Tony, Rosalie, Francis
- 10/08 New Hose Reel installed in pavilion. Tony
- 20/07 Light Standards restored and converted to LED. Tony
- 18/05 Official Tides Reach letterbox installed by Tony.